Matte-black 40-yard roll-off dumpster staged on a framed-out residential construction site in Allentown, framing lumber stacked nearby, hooklift delivery truck visible in the background under bright Colorado daylight

Construction dumpster rental in Allentown

Need a roll-off dumpster in Allentown? Start with a 20-Yard Container; we swap it fast and drop driveway boards to protect pavement.

Jobsite Roll-off Containers for General Contractors

Our construction fleet runs 20-, 30-, and 40-yard roll-offs across the Allentown metro and Lehigh; these heavy-duty units feature reinforced steel sidewalls, walk-in rear swing doors, and steel bottom rollers for framers, roofers, and demo crews. We set every container on protective driveway boards to guard your site. Call (610) 840-6996 to discuss contractor pricing and tonnage rates for your upcoming multi-phase projects.

Matte-black 20-yard roll-off construction dumpster with heavy ribbed steel sidewalls and swing rear doors at a working jobsite in Allentown, sitting directly on compacted dirt with an unmarked white hauler partially visible at the far edge of the frame.

20-yard construction roll-off

The 20-yard roll-off measures 20 feet long, 7 feet wide, and 4 feet tall, with about 2 tons of debris included.

Our 20-yard container fits kitchen and bath remodels, single-room demo, and small framing jobs in tight spaces.

Matte-black 30-yard roll-off construction dumpster sitting directly on the compacted-dirt site of a framed single-family home build in Allentown, drywall and lumber scrap loaded inside.

30-yard construction roll-off

The 30-yard roll-off runs 22 feet long, 8 feet wide, and 6 feet tall, with about 4 tons of capacity included.

The 30-yard container handles whole-house remodels, additions, and new-build framing with high walls for bulky drywall and lumber.

Matte-black 40-yard roll-off construction dumpster being lowered from a white-cab hooklift delivery truck onto the compacted-dirt jobsite at a commercial build site in Allentown

40-yard construction roll-off

The 40-yard roll-off stretches 22 feet long, 8 feet wide, and stands 8 feet tall, with about 5 tons of debris included for the haul.

Sized for commercial builds and large tear-outs, the 40-yard roll-off is the largest container staged on active job sites.

Construction Debris, Drywall, Lumber Acceptance

Our containers accept the full range of mixed C&D debris: framing lumber, drywall, plaster, subfloor, insulation, packaging, pallets, and light metals — and everything is sorted at the Allentown transfer station to maximize recovery. Contractors on rolling jobs often set up our commercial recurring hauling agreements, while we follow EPA construction debris recycling guidance for every roll-off we haul away.

  • Framing lumber and offcuts
  • Drywall, plaster, lath
  • Subfloor and sheathing
  • Insulation and vapor barrier
  • Mixed packaging and pallets
  • Light metals and conduit
Worker in a yellow high-visibility vest tossing framing lumber and broken drywall into a matte-black 30-yard construction roll-off dumpster on an active build site in Allentown, bright daylight
Low-profile matte-black lowboy roll-off dumpster loaded with broken concrete slab and rebar at a foundation tear-out in Allentown, skid steer parked beside it, sunny Colorado morning

Concrete, Brick, and Asphalt Heavy-debris Pricing

Dense loads like concrete slab tear-out, brick demo, asphalt millings, or clean dirt need a reinforced-steel lowboy roll-off sized for weight. Our roll-offs handle up to 10,000 pounds per load and sit low enough that a skid steer or wheelbarrow can dump straight in without pushing past USDOT truck weight limits on Allentown routes.

Heavy-debris jobs run on weight tickets from the scale house, not on the yard; the cleanest loads—without any mixed wood, drywall, or trash—earn the lowest per-ton rate. I size the container and coordinate dispatch after a quick call with the site super to manage the total tonnage for your dumpster.

Tonnage Limits and Weight Overage Policy

Each construction roll-off comes with an included tonnage allowance; weight beyond that is billed at our per-ton overage rate against the scale-house ticket. Your upfront quote lists the capacity for every container: this ensures no surprises when the truck weighs in—especially for asphalt shingles. We suggest roofing tear-off jobsite containers for those projects, as heavy shingle loads can quickly eat your standard mixed-debris allowance.

20-yard

3 tons

Included tonnage. Mixed C&D debris.

30-yard

4 tons

Included tonnage. Mixed C&D debris.

40-yard

5 tons

Included tonnage. Mixed C&D debris.

On-site Swap-out and Dispatch Coordination

Multi-week jobs run on a swap rhythm, not single drops; call dispatch when a container is full—that’s the signal to stage a fresh roll-off the same or next business day across the Allentown metro and Lehigh.

Step 1

Text dispatch when full

Site supers text a photo and the container number to the dispatcher — no portal logins, no ticketing.

Step 2

Same- or next-day swap

We haul your full container off the pad and drop an empty in the same spot, so no loading hour is ever lost.

Step 3

Weekend dispatch available

Saturday pulls keep Monday starts clean; Friday afternoon coordination sets the weekend on track.

Insurance and Contractor Account Setup

We issue certificates of insurance to the GC or owner and that means net-30 contractor accounts with consolidated monthly billing for active sites in Allentown; the hooklift fleet stages recurring containers across those jobs — accounts spin up with one call to dispatch.